House Painting Checklist: Plan a Stress-Free Repaint
A well-organised house painting checklist Whitehouse style ensures smooth, high-quality results with no surprises. At Whitehouse Painting & Decorating, we use this exact checklist on every Northamptonshire project—helping homeowners in Northampton, Rushden, Wellingborough and beyond plan efficiently, avoid common pitfalls and enjoy a stress-free repaint.
Whether refreshing a single room or full house interior/exterior, preparation and planning are key. Whitehouse shares our proven checklist so you can coordinate everything like a pro—whether DIY or hiring us.
Whitehouse House Painting Checklist: Before You Start
- Assess scope & budget — Decide interior, exterior or both; count rooms/areas; get free quotes (Whitehouse offers no-obligation site visits).
- Choose colours & finishes — Test large swatches in different lighting; consider room function (e.g. wipeable satin in kitchens/hallways).
- Select quality paint — Low-VOC, durable brands (Dulux, Crown, Farrow & Ball); calculate litres needed accurately.
- Check weather forecast (exteriors) — Avoid rain/ frost for 48 hours before/after; plan summer/autumn for best results.
- Book professionals or gather tools — If hiring Whitehouse, confirm dates; if DIY: rollers, brushes, trays, tape, filler, primer, dust sheets.
Preparation Checklist (1–2 Days Before Painting)
- Clear & protect rooms — Move furniture to centre; cover floors/fittings with dust sheets; remove switch plates/curtains.
- Clean all surfaces — Wash walls with sugar soap; degrease kitchens; treat mould in bathrooms.
- Repair imperfections — Fill cracks/holes with flexible filler; sand smooth; prime patched areas.
- Mask edges & trim — Apply low-tack painter’s tape for crisp lines around windows, doors, skirting.
- Ventilation & safety — Open windows; use low-odour paint; wear mask/gloves if needed.
Painting Day Checklist
- Start top-down — Ceilings first, then walls, trim last.
- Cut in edges first — Use angled brush for corners/trim before rolling.
- Apply thin even coats — 2–3 coats better than one thick; allow proper drying between (check tin).
- Daily cleanup — Wash tools; remove tape while wet; clean spills immediately.
- Final inspection — Check in natural light; touch up missed spots; allow full cure before moving furniture back.
Whitehouse Post-Painting Checklist & Maintenance
Wait 7–14 days before heavy use (full cure); clean gently with mild soap; touch up small marks early. Whitehouse provides aftercare advice and a 12-month guarantee for peace of mind.
See checklist-completed projects in our Projects gallery or explore Services and FAQs.
Want a stress-free repaint with the house painting checklist Whitehouse follows? Contact us today for a free consultation and quote.